News & Insights
The 18,000-square-meter facility can process 600 vehicles per month and sits next to consolidated container loading operations for faster dispatch.
Sieton Auto has opened a dedicated pre-delivery inspection (PDI) and consolidation center in Yiwu, Zhejiang, strategically located near major export logistics hubs.
The 18,000-square-meter facility features 24 inspection bays, an EV battery diagnostic room, photo and video documentation studios, and secured storage for up to 900 vehicles, with a processing capacity of around 600 units per month.
Vehicles passing through the center receive the full Sieton 200-point inspection, professional detailing, and standardized export packaging before being transferred directly to container or ro-ro loading.
Co-locating inspection with consolidation shortens the average order-to-shipment window by an estimated five days and reduces handling-related damage risk.
The Yiwu center is Sieton’s third inspection facility, joining the original Jiading site in Shanghai and a smaller operation serving northern China suppliers.
Hi there! Need help finding a vehicle or getting a quote? Chat with our team on WhatsApp.
+86 131 2070 2093